Our industry is engaged in an important dialogue to improve the efficiency and resilience of real assets through transparency and industry collaboration. This article is a contribution to this larger conversation and does not necessarily reflect GRESB’s position.
The data center boom presents a critical opportunity for owners, developers, and investors: embed decarbonization at the design stage, before carbon, cost, and technology decisions become locked into the asset.
Decarbonization starts before construction
As new data centers scale across the globe, the challenge is clear: how can we build tomorrow’s digital infrastructure without locking in unnecessary carbon emissions today? The answer lies in planning for decarbonization before construction begins.
When sustainability is addressed only after a facility becomes operational, opportunities to influence material and equipment selection, structural design, MEP systems, and construction practices may already have been lost.
But first, we must understand what decarbonization truly means.
Understanding decarbonization: Beyond operational carbon
Decarbonization means reducing greenhouse gas emissions across an asset’s lifecycle. However, data center sustainability discussions often focus on operational energy, renewable electricity, and metrics such as Power Usage Effectiveness (PUE) and Water Usage Effectiveness (WUE).
These are important, but they tell only part of the story. A whole-life carbon approach considers:
- Upfront embodied carbon: Emissions from material extraction, manufacturing, transportation, construction, and installation.
- In-use embodied carbon: Emissions from maintenance, equipment replacement, and refurbishment.
- End-of-life carbon: Emissions from decommissioning and waste processing, alongside opportunities for reuse and recycling.
Renewable electricity can reduce operational emissions, but it cannot erase the carbon already embedded in concrete, steel, electrical infrastructure, MEP systems, and cooling equipment. IT equipment should also be included where relevant to the assessment boundary.
For owners and investors, the implication is clear: operational efficiency does not necessarily equal whole-life carbon efficiency.
Passive first approach: Avoid carbon before you reduce it
The most effective decarbonization strategy begins by avoiding unnecessary emissions.
For new developments, this means challenging design assumptions while alternatives remain feasible. Can the required capacity be delivered with less material? Can lower-carbon alternatives meet performance and resilience requirements? Can MEP systems be optimized without compromising redundancy? Can the facility accommodate future computing and cooling demands without extensive reconstruction?
The approach is to measure, avoid, reduce, substitute, and optimize.
Embodied carbon: Make design and procurement count
Concrete, steel, transformers, switchgear, generators, and cooling systems can contribute substantially to upfront embodied carbon. MEP infrastructure deserves particular attention given data centers’ power density, redundancy, and uptime requirements.
Three actions can help:
- Measure: Use bills of quantities, equipment schedules, specifications, and environmental product declarations (EPDs), supplemented by transparent secondary data methodologies like CIBSE TM65.
- Prioritize: Focus on materials and systems with the greatest carbon impact.
- Procure strategically: Integrate carbon criteria into specifications and supplier evaluations without compromising safety, reliability, or performance.
Designing for modularity, maintainability, and adaptability can also reduce future replacement and refurbishment needs.
Circularity: Protect material and asset value
Data centers evolve rapidly, but their components have different useful lives. Structural systems, electrical infrastructure, cooling equipment, and IT hardware do not necessarily require replacement at the same time. Circularity is not simply an end-of-life strategy. It is a way to avoid unnecessary production, reduce lifecycle emissions, and protect future CapEx.
AI computing demands can drive chip and server upgrades within three to five years, depending on workloads and technology advances. Yet hardware no longer suited to demanding AI training may still support less compute-intensive tasks or suitable inference workloads.
Reuse before retirement should therefore be a priority. Before sending functional equipment to IT asset disposition, operators should assess opportunities to redeploy, repurpose, refurbish, or resell it, subject to performance, cybersecurity, compatibility, and energy-efficiency requirements.
The carbon benefit comes from potentially avoiding new production. Semiconductor fabrication and server manufacturing require energy-intensive processing and materials. Extending equipment life can defer these embodied emissions, reduce demand for virgin materials, and limit electronic waste.
The investment lens: Data, due diligence, and long-term value
As green and sustainability-linked financing gains prominence, investors need credible asset-level data to strengthen due diligence, assess lifecycle costs, and compare performance. Whole-life carbon assessments reveal risks beyond operational metrics, including embodied emissions, equipment replacement, and future adaptation costs. By evaluating CapEx and OpEx together and using consistent methodologies, transparent boundaries, and reliable data, owners and investors can make better-informed decisions on capital allocation, long-term asset value, and sustainability performance.
The question is no longer just how efficiently a data center operates. It is how intelligently it was designed, what future costs it locks in, and how well it can adapt. Decarbonization begins before construction—and so does long-term asset value.
This article was written by Ruchika Malhotra, Co-Founder & Sustainability Head at MoruBld AI. Learn more about MoruBld AI here.
Read more from our partners.